Sign In | Join Free | My frbiz.com |
|
Brand Name : BOYU
Model Number : TY1x120III
Certification : ISO9001
Place of Origin : China
MOQ : 1set
Price : Negotiable
Payment Terms : L/C, T/T
Supply Ability : 100sets/month.
Delivery Time : 15~25 days
Packaging Details : Container
Product type : Tension Machine For Transmission Line Construction
Maximum continuous tension : 120KN
Total weight : 8100kg
Groove numbers : 15
Maximum back pulling force : 90kn
Maximum payoff speed : 5km/h
Cummins Engine Tension Machine For Transmission Line Construction Max Back Pulling Speed 3km/h
Main technical performance | Maximum intermittent tension | 130KN |
Maximum continuous tension | 120KN | |
Corresponding speed | 2.5km/h | |
Maximum payoff speed | 5km/h | |
Corresponding tension | 60KN | |
Maximum back pulling force | 90kn | |
Maximum back pulling speed | 3km/h | |
Diameter of tensile force wheel | 1500mm | |
Groove numbers | 15 | |
Maximum applicable diameter of wire | 40mm | |
Transport dimensions | Length: 5300mm | |
Width: 2300mm | ||
Height: 2600mm | ||
Total weight | 100kg | |
Engine | Model | Cummins 4BTA3.9-C130 |
Rated power | 97kw/2500rpm | |
Transmission System | With closed double-loop hydraulic transmission system and planet decelerator, tension wheel is driven by primary gear. With inversion, the magnitude of reverse traction force is led by exit pressure of pump. In tension condition, hydraulic motor rotation is driven by the tension wheel; the magnitude of tension is controlled by regulating the motor exit pressure. | |
Main pump | Type | Hydraulic control bidirectional variable plunger pump(Germany Rexroth) |
Model | A4VG71EP4/32R | |
Hydraulic motor | Type | Two-way Quantitative Plunger Piston Motor (Germany Rexroth) |
Model | A2FM180/61W | |
Speed reducer | Type | planet Gear Decelerator (Italy Bonfiglioli) |
Model | 310 L2 | |
Reduction ratio | 28 | |
Brake opening pressure | 1.8MPA | |
Electrical System | System voltage | 24V |
Storage battery | 6-QA-110(2 sets) | |
Diesel engine starting | 24V electric starting |
Operate Accord to the Followed Order when Starting
1. After fixed the tension machine, open the “power” switch, pull the start switch to start diesel engine and observe whether the index on the displays is normal.
2. Put all the control handles in the control box in starting position, including:
(1) Put engine throttle in minimum position (idle speed).
(2) Rotate the knob “PULLING HANDLE” to median position, that is position of “TENSION”.
(3) Loosen all the “TENSION REGULATIONT” ” REGULATION OF REEL WINDER PRESSURE”.
(4) Rotate the knob “BRAKE” to the position of “Brake”.
3. Keep the engine in idle speed for 1-2 minutes after starting and observe whether the displays of the instruments are normal at the same time. Pay attention that the index of "BEAKE PRESSURE" can’t be lower than 1.8MPa or higher than 2.5MPa; Otherwise, it is necessary to stop the machine for inspection.
4. Within 10 seconds, if the engine failed to start, the knob should be released immediately and started for a second time after one minute. If it couldn’t start three times in a row, it should be stopped and the operators must find out the reasons, debug them and start later.
5. When delivering under tension, the brake should be released at first. The method is as following: Rotate "Brake" to "Release" position, observe whether the readings of "Brake Pressure" are not less than 3.5Mpa, if the brake pressure had declined, it needs shutdown inspection.
![]() |
Cummins Engine Hydraulic Cable Tensioner Transmission Line Construction Images |